The ground surface settlement, crown settlement, convergence of surrounding rock, etc, are monitored and measured during the Fantun tunnel construction of Jianxing Highway.
在建兴高速樊屯隧道施工过程中,对地表沉降、拱顶下沉、围岩收敛等进行了监控测量。
A new method for analyzing the time-dependent convergence deformation of the underground surrounding rock is presented.
研究了地下洞室围岩的时间效应变形特性,提出了分析围岩时间效应收敛变形的一种新方法。
When the rocks are fractured, roadway convergence is mainly due to expansion deformation of the surrounding rock within the fractured zone in a residual-strength state.
围岩处于破裂状态时,巷道收敛主要是由处于残余强度状态的破裂区围岩的碎胀变形引起的。
应用推荐